Learn how to properly shut down, drain, and store industrial water chillers during winter or holiday downtime. Prevent freezing damage, reduce maintenance risks, and ensure stable restart with professional chiller maintenance best practices.

During winter shutdowns, production pauses, or scheduled maintenance periods, process cooling equipment such as industrial water chillers is often taken offline. Whether the shutdown is due to production line adjustments, routine servicing, or holiday breaks, proper shutdown and storage procedures are essential. Correct chiller maintenance not only protects internal components during downtime but also ensures a fast, stable, and efficient restart when operations resume.
For manufacturers relying on precise temperature control, preventive care during idle periods can significantly reduce repair costs, minimize unexpected alarms, and extend equipment service life.

Why Proper Industrial Chiller Shutdown Matters in Winter
Low ambient temperatures pose a major risk to chillers that still contain cooling water. If residual water freezes when the temperature drops below 0°C (32°F), the expansion of ice can damage pipes, heat exchangers, valves, or seals. These issues often result in costly repairs and unexpected production delays.
In addition to freezing risks, stagnant water left in the system for long periods may cause scale buildup or internal blockages, reducing cooling efficiency. If antifreeze was added during winter operation, excessive concentration or prolonged stagnation may affect pump mechanical seals and trigger alarms during restart.
For these reasons, one of the most widely recommended industrial chiller winter maintenance practices is complete drainage before long-term shutdown.

Step-by-Step Industrial Chiller Water Drainage Procedure
The following general procedure reflects common best practices used in industrial cooling maintenance. Always follow the specific instructions in your equipment manual when available.
* Step 1 – Drain the Water Tank
Open the drain port and fully empty the internal water tank.
* Step 2 – Prepare All Interfaces Before Air Purging
Before using compressed air, open all relevant ports, including the water filling port and drainage outlet.
* Step 3 – Blow the Low-Temperature (L) Outlet
Use a compressed air gun to purge the low-temperature outlet for approximately 80 seconds. After purging, seal the port with a plug.
Tip: Adding a silicone ring at the air gun nozzle helps reduce leakage during purging.
* Step 4 – Blow the High-Temperature (H) Outlet
Repeat the process on the high-temperature outlet for about 80 seconds, then seal it with a plug.
Important: Do not blow into the high-temperature inlet if it contains sensitive components such as flow sensors.
*Step 5 – Purge the Filling Port
Use compressed air to remove remaining moisture from the filling port until no visible water droplets appear.
* Step 6 – Confirm Complete Drainage
Verify that no residual water remains in pipes or connectors.

Industrial Chiller Water Drainage Procedure

Safety Notes During Air Purging
* Keep compressed air pressure below 0.6 MPa to avoid damaging internal pipes.
* Do not blow compressed air into connectors marked with caution labels or sensitive components.
If antifreeze was used and will be reused after the holiday period, consider collecting it in a clean container to reduce operating costs and environmental impact.

Proper Industrial Chiller Storage During Holiday Shutdown
Once drainage is complete, storing the chiller in a suitable environment is equally important. Proper storage reduces the risk of dust accumulation, moisture damage, and accidental impact during downtime.

Recommended Storage Practices
* Place the chiller in a dry, well-ventilated area that does not interfere with normal workshop operations.
* Cover the unit with a clean plastic bag or insulation cover to prevent dust and moisture intrusion.
* Avoid stacking heavy objects nearby or exposing the equipment to accidental collisions during the holiday period.
Good storage practices help ensure the industrial chiller can return to service smoothly, reducing the need for troubleshooting or unexpected maintenance after reopening production lines.

The Value of Professional Chiller Maintenance Support
Industrial chillers are critical to laser processing, CNC machining, UV printing, injection molding, and other precision manufacturing processes. Many experienced manufacturers emphasize clear maintenance procedures, responsive service teams, and practical guidance to help customers protect their cooling systems during seasonal shutdowns.
Professional technical support, especially during maintenance planning or restart preparation, can help users reduce operational risk, improve uptime, and maintain consistent production quality.

Conclusion
Effective winter shutdown and holiday maintenance are key parts of industrial chiller lifecycle management. Thorough drainage, careful compressed air purging, and proper dry storage help prevent freezing damage, scale buildup, and mechanical failures. With well-planned preventive measures, manufacturers can ensure that their industrial chillers restart reliably and maintain stable cooling performance after downtime.

TEYU Chiller Manufacturer & Supplier with 24 Years of Experience

Prev
Chiller Industri sing Hemat Biaya kanggo Peralatan Laser, CNC & Percetakan

We are kene kanggo sampeyan nalika sampeyan mbutuhake kita.

Mangga ngrampungake formulir kanggo ngubungi kita, lan kita bakal seneng mbantu sampeyan.

Ngarep   |     Produk       |     SGS & UL Chiller       |     Solusi Cooling     |     Perusahaan      |    sumber daya       |      Kelestarian
Hak Cipta © 2026 TEYU S&A Chiller | Peta Situs Kebijakan privasi
Hubungi kita
email
Hubungi Layanan Pelanggan
Hubungi kita
email
Batal
Customer service
detect